Wednesday, November 6, 2024
Google search engine

Australia terminates Lockheed Martin armed forces satellite job


SYDNEY (Reuters) – Australia has actually terminated a multi-billion buck armed forces satellite job with Lockheed Martin, with a Department of Defence declaration on Monday claiming the armed force will certainly rather move its emphasis to a multi-orbit system.

Lockheed Martin Australia was introduced as the favored tenderer in 2015 for the Geostationary Earth Orbit (GEO) satellite interactions system, in a job that was to supply Australia’s very first sovereign-controlled satellite interaction system over the Indo-Pacific sea areas.

The job for a solitary orbit satellite with Lockheed Martin had actually been terminated, the Department of Defence claimed in a declaration on Monday.

“With the acceleration in space technologies and evolving threats in space since the project’s commencement, Defence has assessed that a single orbit GEO-based satellite communications system would not meet strategic priorities,” the declaration claimed.

It claimed Australia would certainly rather prioritise a multi-orbit capacity to boost strength for the Australian Defence Force.

In a radio meeting with the Australian Broadcasting Corporation, Prime Minister Anthony Albanese claimed while Australia’s protection spending plan was boosting, his federal government was prioritising its acquisitions.

When the Lockheed Martin job was introduced in 2015 it was claimed by authorities to be a “multi billion dollar” offer, however in Monday’s Defence declaration there was no particular worth to the terminated job.

However, Defence claimed in the declaration that it will certainly still designate A$ 9-12 billion ($ 13.87 billion) for area capacities.

($ 1 = 1.5135 Australian bucks)

(Reporting by Kirsty Needham in Sydney; Editing by Michael Perry)



Source link

- Advertisment -
Google search engine

Must Read